LPG FPSO Plant

Client CONOCO Indonesia Inc. (at the time)
Location Belanak/Indonesia
Completion 2004
Scope EPC/Installation
Capacity Crude Oil: 100,000 BPSD
Sales Gas: 430 MM SCFD

JGC, along with KBR, landed a contract for a project in 2001 from an Indonesian entity of CONOCO (at the time) of the U.S. The plant was completed in 2004, and trial operation and moorings were completed the following year, with production also starting in 2005.

This was the first project in the Asia-Pacific region to construct an FPSO equipped with LPG production facilities, and the crude oil and LPG produced are loaded directly onto tankers out at sea to be shipped out, while gas is piped directly to Malaysia.

The knowhow gained through the execution of this project, which involved the construction of JGC's first FPSO plant, has been a huge help in the landing of contracts and execution of projects for the construction of FPSO and FLNG plants since then.