Modular Construction

Meeting Short Deadlines with Modular Construction

To meet the needs of clients hoping to complete and start operations at their plants as soon as possible, JGC applies modular construction techniques, which enable significant shortening of the construction schedule.

In modular construction, equipment, piping units and structures are assembled beforehand in a prefab factory and undergo a portion of required inspections before being sent to the actual construction site for load-in and installation. In conventional construction methods, construction of underlying steel structure, exterior and interior takes place first. After that, equipment and facilities are installed and piping and cable are connected. So the construction of the building is usually a bottle neck of the total construction schedule. In modular construction, fabrication of facilities and equipment can take place simultaneously with building construction work, allowing for a significant reduction in the on-site time required for dealing with equipment and facilities, consequently shortening the entire work schedule.

Example module for waste water decontamination tank
Example module for waste water decontamination tank

Example module for buffer storage tanks
Example module for buffer storage tanks